Get GT13E2 Quote
⚡ AI Data Centers Drive Unprecedented Gas Turbine Demand

Every GT13E2 Part.
One Source.

From compressor blades to turbine rotors, from EV/AEV burners to hot gas path components — we manufacture every part for the Alstom GT13E2 gas turbine. With AI data centers driving unprecedented power demand and new turbine slots booked through 2030, existing GT13E2 fleets have never been more valuable. Four decades of heritage (BBC→ABB→Alstom→GE), Hong Kong-based global logistics.

170+ GT13E2 Units Worldwide IN738 & 12Cr Material Certified BBC→ABB→Alstom→GE Heritage
Industrial gas turbine cutaway showing compressor, combustor, and turbine stages

Precision Engineering for the World's Most Demanding Power Applications

From the 21-stage compressor to the 5-stage reaction turbine, every component is manufactured to OEM specifications with full material traceability — IN738 superalloy, 12Cr steel, Hastelloy X, and advanced thermal barrier coatings.

Core Business Capabilities

We operate across the full gas turbine value chain — from equipment sourcing to precision parts manufacturing. As AI-driven power demand surges and new turbine delivery stretches to 2030, our secondhand equipment and parts manufacturing capabilities fill the critical supply gap.

65 GWUS Data Center Demand by 2028
100 GWGE Vernova Backlog Q1 2026
$22.6BGlobal Market Size 2025
11.2%Market CAGR 2026-2035

With OEM production capacity capped at ~10 GW/year through 2030 against a 100 GW global backlog, secondhand GT13E2 units and independent parts manufacturing have become mission-critical infrastructure for the AI era.

Secondhand Equipment Trading

Source and sell pre-owned gas turbines worldwide. With OEM backlogs at 100 GW and new unit delivery slots booked through 2030, quality secondhand GT13E2 units are the fastest path to deployable capacity for data centers and power plants.

Buy & Sell

International Import & Export

Hong Kong-based logistics hub enabling seamless cross-border equipment movement. From Europe to Asia Pacific — the world's largest gas turbine market at 35% share — we navigate customs clearance, compliance documentation, and door-to-door delivery.

Global Logistics

Gas Turbine Maintenance & Repair

Comprehensive overhaul, hot gas path inspection, and emergency repair services. With 99.1% fleet reliability and operators extending unit lifecycles to meet surging power demand, our engineering team operates across power plants globally.

Field Service

Precision Parts Manufacturing

Manufacture every replacement component for the Alstom GT13E2 — from compressor blades and turbine vanes to EV/AEV burners and hot gas path parts. As OEM lead times lengthen, independent parts manufacturing becomes mission-critical. Full material certification including IN738 and 12Cr steel.

GT13E2 Specialist
GT13E2 SPECIALIST

GT13E2 Full Component Coverage

The GT13E2 gas turbine — 11.18m long, 343 tonnes, with a 5-stage reaction turbine, 21/16-stage compressor, annular combustion chamber with 72 EV / 48 AEV burners, and a welded rotor assembly. We manufacture replacement parts for every single component in this machine. With global gas turbine demand surging at 11.2% CAGR and new unit slots booked through 2030, maintaining the 170+ existing GT13E2 fleet worldwide is more critical than ever.

5-Stage Turbine Blades (IN738 + TBC)
21/16-Stage Compressor Blades (12Cr Steel)
EV & AEV Burner Assemblies (72/48 Units)
Welded Rotor, Hot Gas Path & Seals
View Complete Parts Catalog
GT13E2
COMPRESSOR — 21/16 Stages
COMBUSTOR — 72 EV / 48 AEV Burners
TURBINE — 5 Reaction Stages
AIRFLOW →   |   11.18m   |   343t   |   TIT 1131°C
GT13E2 TECHNICAL SPECIFICATIONS

Engineering Parameters at a Glance

Power Output (ISO)168 MWBase load rating
Thermal Efficiency34.6%Simple cycle
Turbine Inlet Temp1131 °CTIT — firing temperature
Exhaust Temperature525 °CSuitable for HRSG
Exhaust Mass Flow510 kg/sISO conditions
Pressure Ratio15.1:1Compressor pressure ratio
Rotor Speed3000 rpm50 Hz grid frequency
Total Length11.18 mTurbine assembly
Total Weight343 tIncluding casing
Compressor Stages21 / 16V96 / MXL variants
Burner Configuration72 EV / 48 AEVDry low NOx
Turbine Stages5Reaction-type blades
GT13E2 COMPONENT CATALOG

Complete Parts Portfolio

We supply both new manufactured and repaired components for every subsystem of the GT13E2. Covering V96 and MXL blade configurations, all Zone 1/Zone 2 variants, and complete installation hardware for B and C inspections.

15+Component Categories
2,400+Parts Produced
100%New + Repair Coverage
AllV96 & MXL Versions
IN738 nickel-based superalloy turbine blades with thermal barrier coating Turbine Blades — IN738 + TBC
5-Stage Reaction Turbine Blades Investment cast IN738/IN738LC nickel-based superalloy with EB-PVD thermal barrier coating. Operating temperature up to 1050°C. Yield strength 825 MPa.
EV burner assembly and combustion components for GT13E2 gas turbine EV/AEV Burner Assembly
72 EV / 48 AEV Burner Units Hastelloy X combustion components with exceptional oxidation resistance up to 1200°C. Complete burner assemblies, lances, and front segments — new and repaired.

Combustor Zone

EV LancesNEWREPAIR
EV Burner AssemblyNEWREPAIR
Front (Burner) SegmentsNEWREPAIR
Zone 1 — Inner & Outer CarrierNEWREPAIR
Zone 2 — Inner & Outer Shell (L/R)NEWREPAIR
Zone 2 Inner Shell Flaps (Casted)NEWREPAIR

Turbine Zone

Outer Sealing Segments Row A, B, CNEWREPAIR
Inner Sealing Segments Row A, B, CNEWREPAIR
Turbine Vane CarrierNEWREPAIR
Rotor Heat Shields (All Rows)NEWREPAIR
Stator Heat Shields (All Rows)NEWREPAIR
V96 & MXL Blades and VanesNEWREPAIR
Intermediate Rings for TVCNEWREPAIR

Compressor Zone

Compressor Blades & VanesNEWREPAIR
Compressor Vane CarrierNEWREPAIR
Intermediate & End PiecesNEWREPAIR
Bladed Rotor (MXL Configuration)NEWREPAIR

Exhaust & Structural

Exhaust Gas CasingNEWREPAIR
Exhaust DiffuserNEWREPAIR

Installation & Consumables

Turbine Blading Assembly HardwareNEW
Compressor Blading Assembly HardwareNEW
Split Line BoltingNEW
CC Assembly HardwareNEW
Consumables & GasketsNEW

Complete Configuration Matrix: We cover all GT13E2 MXL versions of any type. Complete B and C inspection part lists available. Full field service manual and lifting plan documentation provided.

COMPONENT REPAIR

Blade & Vane Repair Program

Capital parts repair based on remaining life assessment. OEM-qualified specialists with proven expertise in ex-ABB/Alstom fleet maintenance. We restore component performance to OEM specifications through advanced coating, welding, and heat treatment processes.

Turbine Blade Repairs & Upgrades

  • Full coating upgrade with modern oxidation & corrosion resistant coatings
  • Internal cleaning and coating for hollow blades extends total service life
  • Blade tips weld-repaired with advanced technology process and superior filler alloys
  • Full solution repair, HIP & heat treatment process to fully restore alloy strength

Turbine Vane Repairs & Upgrades

  • Full coating upgrade with modern oxidation & corrosion resistant coatings
  • High strength, low distortion LPM crack repair and missing metal replacement
  • Lean-correction and seal slot repair for aged vane-carrier induced damage
  • Anti-oxidation tip-seal upgrades for out-of-round vane carriers and casings

Component Assessment & Repair Process

1Inspection
2Stripping
3Solution Heat-Treatment
4Blending
5Welding & Brazing
6Recoating
7Final Heat-Treatment
8Final Inspection
9Quality Reports
10Delivery
QUALITY ASSURANCE

Full-Cycle Quality Control

Quality engineers control parts throughout the entire manufacturing process. From raw material verification to final delivery, every step is documented with full traceability and compliance certification.

Dimensional & Material Testing

  • Dimensional measurement and geometric verification
  • Chemical composition analysis (spectrometry)
  • Destructive tests: tensile, hardness, Charpy, creep
  • Metallography and microstructure analysis

Non-Destructive Testing (NDT)

  • Radiographic Testing (RT) — internal defect detection
  • Ultrasonic Testing (UT) — subsurface flaw inspection
  • Penetrant Testing (PT) — surface crack detection
  • Magnetic Particle Testing (MT) — ferrous material inspection
  • Eddy Current Testing (ET) — conductivity measurement

Process & Documentation Control

  • MQCP and ITP finalized with customer
  • All material controlled before manufacturing start
  • Holding point inspections during manufacturing
  • Certificate of Conformity (CoC) for every batch
  • Final Quality Control Book delivered to customer
FIELD SERVICE

Complete C Inspection Team & Tooling

OEM-qualified specialists with extensive experience in gas turbine maintenance and overhaul. We provide complete C inspection manpower, specialized tooling, and field service support for scheduled and unscheduled outages worldwide.

C Inspection Specialists

  • Outage Lead
  • GT Mechanical Lead
  • Blader Supervisor
  • HGP (Hot Gas Path) Supervisor
  • Generator Supervisor
  • Assessment Supervisor
  • GT Commissioning Engineer
  • E&P (Electrical & Process) Specialist
  • Balancing Specialist

C Inspection Tooling

  • VIGV Tool — base load, start position, closed
  • Cross arm & arm brackets
  • Rotor stands & calibration fixtures
  • Lifting out beams & cable slings
  • Cross beams & protective plates
  • Mounting devices (turbine left & right)
  • Complete GT13E2 lifting plan for C inspection

Maintenance Services

  • Periodic maintenance & scheduled outages
  • Hot gas path inspection (HGP)
  • Overhaul, LTE, and RI services
  • Lifecycle assessment of capital parts
  • Refurbishing, rehabilitation, renovation
  • Field service support for unscheduled outages
PRECISION MANUFACTURING

Nickel-Based Superalloy Parts & Multi-Model Coverage

Gas turbine hot gas path components endure temperatures exceeding 1100°C — only nickel-based superalloys survive. Our precision manufacturing capabilities span investment casting, directional solidification, single-crystal growth, thermal barrier coating (TBC), and CNC machining for every critical component across multiple turbine platforms.

Superalloy Materials — Engineered for Extreme Conditions

IN738 / IN738LC Nickel-Chromium-Cobalt Superalloy · Investment Cast · DS & Equiaxed

Applications: GT13E2 turbine blades (all 5 stages), nozzle guide vanes, first-row buckets. The industry-standard material for land-based gas turbine hot gas path components operating at TIT ≥ 1100°C.

Max Service Temp~1050°C Yield Strength825 MPa Creep ResistanceExcellent ProcessIC + TBC
Inconel 718 Nickel-Iron-Chromium Superalloy · Precipitation Hardened · Wrought

Applications: Compressor discs, rotor shafts, seal rings, bolt assemblies, combustor transition pieces. High-strength structural alloy for moderate-temperature turbine sections up to ~700°C.

Max Service Temp~700°C Yield Strength1034 MPa WeldabilityExcellent ProcessWrought + PH
Hastelloy X Nickel-Molybdenum-Chromium Superalloy · Solid Solution Strengthened

Applications: Combustion chamber liners, transition ducts, flame holders, EV/AEV burner housings. Outstanding oxidation resistance at temperatures up to 1200°C — ideal for combustor zone components.

Max Service Temp~1200°C Oxidation Resist.Exceptional FormabilityExcellent ProcessSheet + Weld

Multi-Platform Parts Manufacturing

Beyond GT13E2 — we manufacture hot gas path and structural replacement parts for the world's most deployed heavy-duty gas turbine models. With OEM lead times extending to 2030+ and independent manufacturers covering only select frames, our multi-platform capability fills a critical gap in the global aftermarket.

ALSTOM / GE GT13E2 E-Class · 164 MW · 170+ units · 35 countries

Full coverage: Turbine blades (IN738+TBC), compressor blades (12Cr), EV/AEV burners, welded rotor, hot gas path, seals, casings

✓ In Production
ALSTOM / GE GT26 F-Class · 262 MW · Sequential combustion

Parts range: HP/LP turbine blades, SEV combustor components, compressor vanes, rotor discs, transition pieces

✓ In Production
SIEMENS ENERGY SGT5-4000F F-Class · 292 MW · V94.3A lineage

Parts range: Turbine blades (Inconel 738), burner elements, vane segments, compressor blading, rotor components

✓ Available
GE VERNOVA 9FA / 7FA F-Class · 256/170 MW · 1200+ units global

Parts range: HGP buckets, nozzle segments, transition pieces, liners, cross-fire tubes, compressor R0 blades

✓ Available
Investment Casting Precision casting for IN738/IN738LC turbine blades with directional solidification (DS) and equiaxed grain control. Shell mold tolerances ±0.1mm.
🛡 TBC Coating Thermal Barrier Coating (YSZ + MCrAlY bond coat) applied via EB-PVD and APS. Extends blade service life 3x at TIT > 1100°C.
🔬 Material Certification ISO 9001:2015 + AS9100D certified. Full traceability from melt to finish. IN738, Inconel 718, Hastelloy X, 12Cr, 304SS certified per OEM spec.
🏭 CNC & Additive 5-axis CNC machining center for structural components. SLM/EBM additive manufacturing capability for complex internal geometries and rapid prototyping.
📐
Reverse Engineering 3D scanning & metallurgical analysis
🔨
Investment Casting IN738/IN738LC precision casting
🚲
HIP Treatment Hot Isostatic Pressing for density
5-Axis CNC Precision machining to OEM tolerances
🌄
TBC Coating EB-PVD/APS thermal barrier coating
🔍
NDT & CMM Non-destructive testing & CMM inspection
📦
Delivery Hong Kong global logistics hub
INDUSTRY APPLICATIONS

Powering Critical Infrastructure Worldwide

From AI data centers to offshore platforms, gas turbines drive the world's most demanding power applications. Our parts and expertise keep these mission-critical systems running — wherever they are.

Gas turbine power plant at dusk with exhaust stacks

Power Generation

Base-load and peaking power plants worldwide rely on GT13E2 turbines. We supply critical parts to keep 170+ units across 35 countries operational, ensuring grid stability and energy security.

170+ Units · 35 Countries
AI data center facility with server racks and cooling infrastructure
📸

AI Data Centers

With US data center demand projected to reach 65 GW by 2028, gas turbines are the fastest path to reliable on-site power. Our rapid parts supply minimizes downtime for hyperscale operators.

65 GW Demand by 2028
Offshore oil and gas platform with gas turbine generators

Oil & Gas

Pipeline compression, LNG processing, and offshore platforms depend on continuous turbine operation. Our Hong Kong logistics hub delivers parts rapidly to remote locations worldwide.

LNG · Offshore · Pipeline
Naval vessel with gas turbine propulsion system at sea

Marine Propulsion

Naval fleets and commercial vessels powered by industrial gas turbines require certified spare parts with rapid availability. We support marine operators with full component coverage and field service.

Naval · Commercial
FOUR DECADES OF TURBINE EXPERTISE

A Legacy of Engineering Excellence

The GT13E2 carries the DNA of turbine engineering's greatest names. From BBC's original design through ABB, Alstom, and GE — each era refined the technology. We manufacture parts for all iterations, understanding every engineering decision made along the way.

BBC
1980s Brown Boveri & Cie Original GT13E2 design conceived. Pioneered EV burner technology and established the 168 MW platform architecture.
ABB
1990 ABB Power Generation BBC merger with Asea created ABB. GT13E2 production scaled, MXL variant introduced with upgraded blade profiles.
ALS
2000 Alstom Power ABB's power division acquired by Alstom. V96 upgrade deployed across global fleet. 170+ units installed in 35 countries.
GE
2015 GE Power Alstom power business acquired by GE. GT13E2 fleet now backed by our independent parts supply — filling the OEM gap.

GT13E2 — Powering the AI Era Across 35 Countries

170+GT13E2 Units Worldwide
35Countries Deployed
2,400+GT13E2 Parts Produced
99.1%Fleet Reliability
✓ ISO 9001:2015 ✓ AS9100D

Global Client Reference List

🇺🇸USA
🇸🇦Saudi Arabia
🇮🇴Iraq
🇦🇹Austria
🇩🇪Germany
🇪🇸Spain
🇦🇪UAE
🇮🇩Indonesia
🇵🇱Poland
🇮🇹Italy
🇳🇱Netherlands
🇨🇳China
🇲🇽Mexico
🇹🇼Taiwan, China
🇷🇺Russia
🇰🇷India
🇩🇰Japan
🇭🇰South Korea

GT13E2 Component Categories

Every subsystem, every part. From inlet guide vanes to last-stage exhaust blades. In an era of unprecedented turbine demand, comprehensive parts availability is your competitive edge.

GT13E2 gas turbine unit on factory floor
In Stock

GT13E2 — Full Parts Coverage

Every component manufactured | IN738 + 12Cr Certified

GT26 heavy-duty gas turbine unit
Available

GT26 — Parts & Units Available

Alstom heavy-duty | Maintenance & overhaul support

Siemens SGT5-4000F gas turbine unit
In Stock

Siemens SGT5-4000F — Units in Stock

Pre-owned | Inspected & certified for deployment

INDUSTRY PULSE

News & Insights

Apr 2026

GE Vernova Gas Turbine Backlog Reaches 100 GW on Data Center Demand

Q1 2026 orders hit $18.3B (+71% YoY). Data center electrification orders alone reached $2.4B — more than all of 2025 combined. Annual production capacity capped at ~10 GW/year through 2030.

Dec 2025

US Data Centers Face 45 GW Power Shortfall by 2028

With 65 GW of projected demand from AI data centers between 2025-2028, grid interconnection queues stretching 5+ years make gas turbines the fastest viable path to reliable power generation.

Industry Report

Global Gas Turbine Market to Reach $64.8B by 2035 at 11.2% CAGR

Asia Pacific leads with 35% market share. Heavy-duty turbines dominate as data center operators prioritize reliability. Secondhand and refurbished units see surging demand amid OEM delivery bottlenecks.