Get GT24 Quote
Spare Parts & Components

GT24 Gas Turbine Spare Parts & Components

Sequential-combustion (reheat) GT24 parts manufactured to OEM drawings — HP/LP turbine blading, EV and SEV burner hardware, combustor heat shields and compressor scope, with EN 10204 3.1 certification.

GT24 Spare Parts We Manufacture

ZURN Power covers the GT24 parts scope for Alstom sequential-combustion heavy-duty gas turbines. Each component family below is produced in-house against OEM drawings or reverse-engineered from a supplied sample, with material selection and dimensional inspection matched to OEM specification.

GT24 Hot Gas Path Components

The GT24 splits expansion across two turbines. The HP turbine is driven by the first (EV) combustor; the gas is then reheated in the SEV combustor before entering the LP turbine. That architecture delivers high specific output and flat part-load efficiency — and it also means there are two hot gas paths to maintain. HP blading runs at the highest gas temperature in the machine, while LP blading sees reheat temperature across a larger annulus, so coating condition and cooling-hole integrity matter on both. We manufacture these components from nickel-base superalloys with thermal barrier coating applied on request, finished by 5-axis machining and verified with full dimensional reports.

GT24 Combustion System Parts

Sequential combustion uses an annular EV combustor for the first stage and an SEV reheat combustor ahead of the LP turbine. Burner condition governs NOx performance, flame stability and load flexibility, so worn burner hardware shows up first as emissions drift and turndown problems rather than as a trip. We supply EV and SEV burner components, heat shield tiles, liner segments and transition-duct hardware to OEM drawings, with material traceability and EN 10204 3.1 certification as standard.

GT24 Compressor & Rotor Parts

The axial compressor feeds both combustors, and its condition sets the output and heat rate of the whole machine. ZURN Power manufactures compressor rotor blades, stator vanes, diaphragms and seal strips, plus rotor spacers and coupling hardware, strictly to drawing. Blades are batch-inspected for profile, root fit and balance, supporting full rotor overhauls as well as single-stage replacement.

Ordering from a Drawing or BOM

Ratings, stage counts and burner arrangements vary by frame revision and by any uprate already applied. We do not guess part numbers — send the OEM number, drawing or a sample and we quote against it.

Component familyWhat we need from youTypical lead time
Turbine bladingPart number or drawing + revision8–14 weeks
Combustor hardwareCombustor arrangement / drawing8–14 weeks
Compressor bladingStage + part number8–14 weeks
Rotor componentsDrawing + material spec8–14 weeks

Manufacturing Capability & Certification

ZURN Power (Jiangsu Roban Special Alloy Co., Ltd.) produces GT24 spare parts by OEM-drawing machining and reverse engineering from supplied samples. Materials cover the nickel-base superalloys used in HP and LP turbine service, with thermal barrier coating applied in-house. Every shipment includes an EN 10204 3.1 material certificate and a dimensional inspection report. Standard lead time is 8–14 weeks, with export experience across the Middle East, Southeast Asia, Europe and Russia.

Frequently Asked Questions

Which GT24 parts does ZURN Power manufacture?

We cover EV and SEV burner hardware, combustor heat shields and liner segments, transition-duct parts, HP and LP turbine blades and vanes, compressor rotor and stator blading, and rotor spacers and coupling hardware — built to OEM drawings or reverse-engineered to sample.

Can you supply both EV and SEV burner hardware?

Yes. Sequential-combustion machines need both stages maintained together; we quote EV and SEV burner components as one package so burner condition stays matched across the machine.

Are your GT24 components certified?

Yes. Every part ships with an EN 10204 3.1 material certificate, full traceability to heat lot, and a dimensional inspection report.

What is the lead time for GT24 spare parts?

Standard lead time is 8–14 weeks depending on component type, coating requirement and casting complexity. Expedited review is available on request.

How do I get a quote?

Email your part number, drawing or BOM to hanson@zurnpower.com, or message Hanson on WhatsApp +86 186 1687 9105. Quotes for B2B projects are issued after drawing review.

RFQ-Ready Information — GT24

Everything a procurement engineer needs to raise an RFQ for GT24 parts in one place: material grades, manufacturing route, supply modes, lead times and the exact data we need to quote. No OEM authorization required — ZURN Power manufactures and repairs to OEM drawing or by reverse engineering.

Material Grades & Manufacturing Route

ComponentMaterial gradeManufacturing routeTypical OEM ref.
Turbine rotor bladeIN738LC / IN738 / EEQ111 / Mar-M247Vacuum investment casting + HIP + heat treat + aluminide / MCrAlY coatingHTCT155750R0002
Nozzle guide vane / turbine vaneIN738LC / IN939 / Mar-M247 / EEQ111Vacuum investment casting + HIP + heat treat + TBCHTCT155658P0001
Burner, liner & transition pieceIN625 / IN718 / Hastelloy C-276 / 1.4841Sheet forming + welding + machining + heat treatHTCT124748R0115
Compressor blade & stator vane12Cr martensitic / 17-4PH / Ti-6Al-4VPrecision forging + 5-axis CNC + shot peening + FPIPer stage drawing
Rotor disc, spacer & tie bolt26NiCrMoV145 / 1CrMoV / IN718Open-die forging + machining + UT / MT + balancePer rotor drawing
Seals, casings & high-temp boltingIN718 / X22CrMoV12-1 / 1.4980Machining + heat treat + clearance & preload verificationPer drawing

Supply Modes, MOQ & Lead Time

Supply modeMOQLead time
New manufacture to OEM drawing or reverse-engineered from sample1 pc8–14 weeks
Repair & refurbishment — weld build-up, HIP, re-heat-treat, re-coat, re-machine1 pc4–8 weeks
Exchange pool / consignment stockPer contractEx-stock – 4 weeks
Outage emergency response1 pcBy agreement

Lead times are indicative from drawing approval. Outage / emergency response available on request.

Certification & Quality Documents

What to Send for a Firm Quote

All parts are new-manufactured or repaired by ZURN Power — independent alternative source, not an authorized OEM distributor.

WhatsApp RFQ Email RFQ Download drawing checklist

Direct engineering line: +86 186 1687 9105 · sales@zurnpower.com

Request a GT24 Parts Quotation

Send your GT24 BOM, part numbers or drawings — our engineering team will respond with scope, EN 10204 3.1 certification and lead time (8–14 weeks standard).

Request a QuoteEmail your part number, drawing or BOM
China & Asia-Pacifichanson@zurnpower.com+86 186 1687 9105
General Inquiriessales@zurnpower.comGlobal — All Markets

ABB / Alstom Gas Turbine Family — All 12 Models We Support

Dedicated spare parts, repair and technical support pages for every model of the ABB / Alstom heavy-duty fleet:

💬 WhatsApp · +86 186 1687 9105✉ Email · sales@zurnpower.com📞 Call · +86 186 1687 9105