Spare Parts & Components

GT25 Gas Turbine Spare Parts & Components

GT25 sequential-combustion spare parts manufactured to OEM drawings — HP/LP turbine blading, EV and SEV burner hardware, combustor heat shields and compressor scope, EN 10204 3.1 certified.

GT25 Spare Parts We Manufacture

ZURN Power supplies GT25 spare parts for Alstom sequential-combustion heavy-duty gas turbines. Component families are produced in-house against OEM drawings or reverse-engineered from a supplied sample, with material and dimensional control matched to OEM specification.

GT25 Hot Gas Path Components

GT25 shares the sequential-combustion architecture of the GT24 family: a first-stage EV combustor drives the HP turbine, then the gas is reheated in the SEV combustor and expanded through the LP turbine. The practical consequence for parts planning is that the hot section is not one scope but two — HP blading runs at peak gas temperature, LP blading carries reheat temperature over a larger annulus, and coating and cooling-hole condition need to be assessed on both before an inspection interval is set. We manufacture HP and LP turbine blading in nickel-base superalloys with optional thermal barrier coating, finish-machined on 5-axis equipment and delivered with full dimensional reports.

GT25 Combustion System Parts

Sequential combustion places an annular EV combustor ahead of the HP turbine and an SEV reheat combustor ahead of the LP turbine. Burner condition governs emissions, flame stability and load flexibility: worn hardware tends to show as NOx drift and reduced turndown before it becomes a reliability problem. ZURN Power supplies EV and SEV burner components, heat shield tiles, liner segments and transition-duct parts to OEM drawings with EN 10204 3.1 certification.

GT25 Compressor & Rotor Parts

The axial compressor supplies both combustors and sets the output and heat rate of the plant. We manufacture compressor rotor blades, stator vanes, diaphragms and seal strips, plus rotor spacers and coupling hardware, strictly to drawing, with batch inspection of profile, root fit and balance.

Ordering from a Drawing or BOM

Ratings, stage counts and burner arrangements vary by frame revision and by any uprate already applied. We do not guess part numbers — send the OEM number, drawing or a sample and we quote against it.

Component familyWhat we need from youTypical lead time
Turbine bladingPart number or drawing + revision8–14 weeks
Combustor hardwareCombustor arrangement / drawing8–14 weeks
Compressor bladingStage + part number8–14 weeks
Rotor componentsDrawing + material spec8–14 weeks

Manufacturing Capability & Certification

ZURN Power (Jiangsu Roban Special Alloy Co., Ltd.) produces GT25 spare parts by OEM-drawing machining and reverse engineering from supplied samples. Materials cover the nickel-base superalloys used in HP and LP turbine service; thermal barrier coatings are applied in-house. Every shipment includes an EN 10204 3.1 material certificate and a dimensional inspection report. Standard lead time is 8–14 weeks.

Frequently Asked Questions

Which GT25 parts does ZURN Power manufacture?

EV and SEV burner hardware, combustor heat shields and liner segments, transition-duct parts, HP and LP turbine blades and vanes, compressor blading, rotor spacers and coupling hardware — to OEM drawings or reverse-engineered to sample.

Is GT25 hot gas path hardware the same as GT24?

The two frames share the sequential-combustion architecture, but component geometry and part numbers differ by frame and revision. We quote against your part number or drawing rather than assuming interchangeability.

Are your GT25 components certified?

Yes. EN 10204 3.1 material certificate, heat-lot traceability and a dimensional inspection report ship with every part.

What is the lead time for GT25 spare parts?

Standard lead time is 8–14 weeks depending on component type, coating requirement and casting complexity.

How do I get a quote?

Send your part number, drawing or BOM to hanson@zurnpower.com, or message Hanson on WhatsApp +86 186 1687 9105.

RFQ-Ready Information — GT25

Everything a procurement engineer needs to raise an RFQ for GT25 parts in one place: material grades, manufacturing route, supply modes, lead times and the exact data we need to quote. No OEM authorization required — ZURN Power manufactures and repairs to OEM drawing or by reverse engineering.

Material Grades & Manufacturing Route

ComponentMaterial gradeManufacturing routeTypical OEM ref.
Turbine rotor bladeIN738LC / IN738 / EEQ111 / Mar-M247Vacuum investment casting + HIP + heat treat + aluminide / MCrAlY coatingHTCT155750R0002
Nozzle guide vane / turbine vaneIN738LC / IN939 / Mar-M247 / EEQ111Vacuum investment casting + HIP + heat treat + TBCHTCT155658P0001
Burner, liner & transition pieceIN625 / IN718 / Hastelloy C-276 / 1.4841Sheet forming + welding + machining + heat treatHTCT124748R0115
Compressor blade & stator vane12Cr martensitic / 17-4PH / Ti-6Al-4VPrecision forging + 5-axis CNC + shot peening + FPIPer stage drawing
Rotor disc, spacer & tie bolt26NiCrMoV145 / 1CrMoV / IN718Open-die forging + machining + UT / MT + balancePer rotor drawing
Seals, casings & high-temp boltingIN718 / X22CrMoV12-1 / 1.4980Machining + heat treat + clearance & preload verificationPer drawing

Supply Modes, MOQ & Lead Time

Supply modeMOQLead time
New manufacture to OEM drawing or reverse-engineered from sample1 pc8–14 weeks
Repair & refurbishment — weld build-up, HIP, re-heat-treat, re-coat, re-machine1 pc4–8 weeks
Exchange pool / consignment stockPer contractEx-stock – 4 weeks
Outage emergency response1 pcBy agreement

Lead times are indicative from drawing approval. Outage / emergency response available on request.

Certification & Quality Documents

What to Send for a Firm Quote

All parts are new-manufactured or repaired by ZURN Power — independent alternative source, not an authorized OEM distributor.

WhatsApp RFQ Email RFQ Download drawing checklist

Direct engineering line: +86 186 1687 9105 · sales@zurnpower.com

Request a GT25 Parts Quotation

Send your GT25 BOM, part numbers or drawings — our engineering team will respond with scope, EN 10204 3.1 certification and lead time (8–14 weeks standard).

Request a QuoteEmail your part number, drawing or BOM
China & Asia-Pacifichanson@zurnpower.com+86 186 1687 9105
General Inquiriessales@zurnpower.comGlobal — All Markets

ABB / Alstom Gas Turbine Family — All 12 Models We Support